I'm still working on completing the GOC. Lots of little things eating up all my time,so progress has been slower than I would like. I'm really close to completion though and here are some pictures from the last few weeks.
Here is the first screen panel on.
The screen and frame are above the ground to limit water damage.
I will have one smaller seperate section 4x7x7. Here's the framing going in for it.
The top framing.
The divider's in, the door will go in last.
I amended the soil and plated a bunch of plants. I'll post pictures of them at the end.
Overall shot.
Thwe next part of this project is making a box to house the water filters, controller, plug and valves. I'm also putting in a spicot.
I have the box stained and installed. I'm hoping to get some water going tomorrow until I get all my valves ready to go in.
Here is the first screen panel on.
The screen and frame are above the ground to limit water damage.
I will have one smaller seperate section 4x7x7. Here's the framing going in for it.
The top framing.
The divider's in, the door will go in last.
I amended the soil and plated a bunch of plants. I'll post pictures of them at the end.
Overall shot.
Thwe next part of this project is making a box to house the water filters, controller, plug and valves. I'm also putting in a spicot.
I have the box stained and installed. I'm hoping to get some water going tomorrow until I get all my valves ready to go in.